I'm sure the story of how and when the upgrades to the Broadway interchange will happen will be a multi-part, multi-year story--it already is. The Mercury Times has an article on the basics today that notes
The current mazelike setup, which includes 19 approaches and connections to the freeway, will be made simpler, and all the onramps and offramps will be replaced.
And mentions the community outreach program that will have more of the details
The plans are available at dot.ca.gov/dist4/envdocs.htm, and comments can be sent to [email protected]. The agency will hold an open house from 6 to 8 p.m. on Sept. 15 in the Lane Community Room at the Burlingame Public Library.
The Peninsula Ave. interchange is a simple project compared to B'way--and how do you do anything before we know what will happen with the High Cost Rail idiocy planned to run right through there as well? Let's not mess up the bike overpass either.
Recent Comments